본문 바로가기

BIM_Guidelines

고속도로 스마트설계 지침_20.09.00

고속도로 스마트설계 지침

발행처: 한국도로공사 설계처

발간등록번호: AN01145-000139-14

출처:

 

kroad_54_자료실

자료실 정부/정책자료 기술/정책기사 기타 공지사항 상세내용 고속도로스마트설계지침(2020.9) 작성자 관리자 등록일 2021.03.04 조회수 2156 고속도로 스마트 설계지침입니다.업무에 참고하세요.출

www.kroad.or.kr

 


첨부파일

고속도로 스마트설계 지침_2020.09_s.pdf
9.07MB

 


목차

제1장 일반 사항

  • 1.1 목적 ······································································································································· 2
  • 1.2 적용 대상 ····························································································································· 2
  • 1.3 적용 범위 ····························································································································· 2
  • 1.4 지침 구성 ····························································································································· 3
  • 1.5 용어 및 약어의 정리 ········································································································· 3
  • 1.5.1 용어································································································································· 3
  • 1.5.2 약어································································································································· 5
  • 1.6 지침의 개정························································································································· 5
  • 1.6.1 개정································································································································· 5
  • 1.6.2 버전의 부여 기준········································································································· 5

제2장 기본 사항

  • 2.1 BIM 전면설계 ······················································································································· 7
  • 2.2 BIM 저작도구······················································································································· 7
  • 2.2.1 기본 사항······················································································································· 7
  • 2.2.2 데이터 파일 포맷········································································································· 7
  • 2.2.3 BIM 저작도구 선정······································································································· 7
  • 2.3 BIM 라이브러리··················································································································· 8
  • 2.3.1 개요································································································································· 8
  • 2.3.2 BIM 라이브러리 플랫폼······························································································· 8
  • 2.3.3 도로분야 BIM 라이브러리 플랫폼의 활용······························································· 8
  • 2.4 책임 및 권리 ······················································································································· 8
  • 2.4.1 설계도서와 BIM 데이터의 일치················································································· 8
  • 2.4.2 설계도서와 BIM 데이터의 관계················································································· 8
  • 2.4.3 BIM 성과품의 권리······································································································· 9
  • 2.4.4 BIM 데이터의 보안······································································································· 9

제3장 BIM 전면설계 기준

  • 3.1 BIM 데이터 표현 수준····································································································· 11
  • 3.1.1 BIM 데이터 표현 수준······························································································· 11
  • 3.1.2 BIM 데이터 표현 수준 적용····················································································· 12
  • 3.2 BIM 데이터 작성··············································································································· 13
  • 3.2.1 일반 사항····················································································································· 13
  • 3.2.2 BIM 데이터 구성········································································································· 13
  • 3.2.3 구간 및 객체 분할····································································································· 14
  • 3.2.4 BIM 지형 데이터········································································································· 15
  • 3.2.5 BIM 지층 데이터········································································································· 15
  • 3.2.6 도로분야 BIM 데이터 작성······················································································· 16
  • 3.2.7 교량분야 BIM 데이터 작성······················································································· 17
  • 3.2.8 터널분야 BIM 데이터 작성······················································································· 19
  • 3.3 설계도면 작성 ··················································································································· 22
  • 3.3.1 설계도면 작성 원칙··································································································· 22
  • 3.3.2 설계도면 작성 대상··································································································· 22
  • 3.3.3 형상 표현····················································································································· 23
  • 3.4 설계수량 산출 ··················································································································· 23
  • 3.4.1 설계수량 산출 원칙··································································································· 23
  • 3.4.2 설계수량 산출 대상 및 방법··················································································· 23

제4장 스마트설계 지침

  • 4.1 스마트설계 개념 ··············································································································· 26
  • 4.2 기본설계 단계 ··················································································································· 26
  • 4.2.1 노선 선정····················································································································· 26
  • 4.2.2 출입시설 형식 결정··································································································· 28
  • 4.2.3 무인비행장치 측량····································································································· 30
  • 4.2.4 노선 자문 및 VE, 주민설명회 활용······································································· 31
  • 4.3 실시설계 단계 ··················································································································· 32
  • 4.3.1 배수 시뮬레이션········································································································· 32
  • 4.3.2 도로주행 시뮬레이션································································································· 34
  • 4.3.3 경관설계 시뮬레이션(선택사항)············································································· 35
  • 4.3.4 일조영향 시뮬레이션(선택사항)············································································· 36
  • 4.4 스마트설계 성과품··········································································································· 37
  • 4.4.1 스마트설계 성과품 제출 기준················································································· 37
  • 4.4.2 스마트설계 성과품 제출 목록················································································· 37

부속서-1 BIM 전면설계 과업내용서 표준(안)

부속서-2 BIM 결과보고서 표준 템플릿

부속서-3 스마트설계 상세 설명서

 


디이씨(D.E.C)

martin@dec-w.com

사업자 정보 표시
디이씨(DEC) | 이정희 | 경기도 고양시 덕양구 항동로 128, 924호 | 사업자 등록번호 : 220-10-09832 | TEL : 070-8657-2850 | Mail : martin@dec-w.com | 통신판매신고번호 : 제 2024-고양덕양구-2952호 | 사이버몰의 이용약관 바로가기