「조달청 시설사업 BIM 적용지침서 v2.1」개정 알림 

조달청 공지사항 / 등록일 : 2022-12-28

 

조달청

조달청

www.pps.go.kr

 

  •  조달청 시설공사 맞춤형서비스 대상사업에 적용하는 BIM의 모델 작성 및 납품, 활용, 관리기준을 개정하여 이를 공개합니다.
  • 본 지침서는 2023년 1월 1일부터 조달청 시설공사 맞춤형서비스로 발주하는 BIM 적용 공사의 ‘설계공모 지침’, ‘설계용역 과업지침서’ 및 ‘입찰안내서’에 적용할 예정이니 참고하시기 바랍니다.

첨부파일

시설사업 BIM 적용지침서 v2.1.pdf
0.88MB

 

부속서1_BIM 정보입력기준.pdf
0.39MB

 

부속서2_BIM 정보표현수준.pdf
0.20MB

 

부속서3_BIM 업무수행계획서(표준 템플릿).pdf
0.39MB

 

부속서4_BIM 결과보고서(표준 템플릿).pdf
0.58MB

 

부속서5_개산견적을 위한 수량 기초데이터(표준 템플릿).pdf
0.26MB

 

부속서6_BIM 설계대가 사후정산서(표준 템플릿).pdf
0.23MB

 

부속서7_관급자재 BIM 라이브러리 제작기준.pdf
0.33MB

 

부속서8_사용자 가이드.pdf
16.93MB

 

시설사업 BIM 적용지침서 v2.1(신구대비표).pdf
1.18MB

 


개정이력사항

버전 제·개정일자 주요개정내용 비고
v1.0 2010. 10. 21. 최초 제정  
v1.1 2012. 04. 19. 1 차 개정  
v1.2 2013. 03. 14. 2 차 개정  
v1.3 2015. 03. 20. 3 차 개정  
v1.31 2016. 03. 31. 4 차 개정  
v1.32 2017. 12. 26. 5 차 개정  
v2.0 2019. 12. 20. 6 차 개정  
v2.1  2022. 12. 26. 7 차 개정  


차례

1. 지침의 개요

  • 1.1 목적 및 원칙···········································································································1
  • 1.2 지침의 구성·············································································································2
  • 1.3 관련 기준 및 규격·································································································2
  • 1.4 용어 및 약어의 정의 ·····························································································2
  • 1.5 지침의 개정·············································································································7

2. 용역자 BIM 업무수행지침

  • 2.1 시설사업 단계별 BIM 업무수행 절차·······························································8
    • 2.1.1 사업공고 단계····································································································8
    • 2.1.2 착수 단계 ············································································································8
    • 2.1.3 업무수행 단계····································································································9
    • 2.1.4 성과품 납품 단계····························································································10
  • 2.2 BIM 품질관리기준 ·······························································································11
    • 2.2.1 기본원칙············································································································12
    • 2.2.2 품질관리의 구분 ······························································································12
    • 2.2.3 품질관리의 수행 ······························································································12

3. 계획설계 BIM 적용지침

  • 3.1 개요 ·························································································································15
  • 3.2 BIM 데이터 작성기준·························································································16
    • 3.2.1 기본원칙············································································································16
    • 3.2.2 BIM 데이터 작성 개요 ··················································································17
    • 3.2.3 공간 BIM 데이터 작성기준··········································································21
    • 3.2.4 구조 BIM 데이터 작성기준··········································································23
    • 3.2.5 건축 BIM 데이터 작성기준··········································································23
    • 3.2.6 토목(대지) BIM 데이터 작성기준·······························································24
  • 3.3 BIM 품질관리기준 ·······························································································26
  • 3.4 BIM 활용기준 ·······································································································28
    • 3.4.1 디자인 검토 ······································································································28
    • 3.4.2 BIM 설계도면 산출························································································29
    • 3.4.3 수량 기초데이터 산출 ····················································································31
    • 3.4.4 환경 시뮬레이션(선택사항) ···········································································32
  • 3.5 BIM 성과품 작성기준·························································································38
    • 3.5.1 BIM 결과보고서······························································································38
    • 3.5.2 중간·실시설계 BIM 업무수행계획서 ··························································39
    • 3.5.3 BIM 데이터 파일 작성기준··········································································40
    • 3.5.4 BIM 성과품 제출기준····················································································42
  • 3.6 책임과 권리···········································································································44

4. 중간설계 BIM 적용지침

  • 4.1 개요 ·························································································································46
  • 4.2 BIM 데이터 작성기준·························································································47
    • 4.2.1 기본원칙············································································································47
    • 4.2.2 BIM 데이터 작성 개요 ··················································································48
    • 4.2.3 공간 BIM 데이터 작성기준··········································································53
    • 4.2.4 구조 BIM 데이터 작성기준··········································································54
    • 4.2.5 건축 BIM 데이터 작성기준··········································································55
    • 4.2.6 기계 및 전기 BIM 데이터 작성기준 ··························································56
    • 4.2.7 토목(대지) BIM 데이터 작성기준·······························································57
  • 4.3 BIM 품질관리기준 ·······························································································59
  • 4.4 BIM 활용기준 ·······································································································60
    • 4.4.1 디자인 검토 ······································································································61
    • 4.4.2 BIM 설계도면 산출························································································62
    • 4.4.3 수량 기초데이터 산출 ····················································································64
    • 4.4.4 환경 시뮬레이션(선택사항) ···········································································65
  • 4.5 BIM 성과품 작성기준·························································································73
    • 4.5.1 BIM 결과보고서······························································································73
    • 4.5.2 실시설계 BIM 업무수행계획서 ····································································74
    • 4.5.3 BIM 데이터 파일 작성기준··········································································75
    • 4.5.4 BIM 성과품 제출기준····················································································77
  • 4.6 책임과 권리···········································································································79

5. 실시설계 BIM 적용지침

  • 5.1 개요 ·························································································································81
  • 5.2 BIM 데이터 작성기준·························································································82
    • 5.2.1 기본원칙············································································································82
    • 5.2.2 BIM 데이터 작성 개요 ··················································································83
    • 5.2.3 공간 BIM 데이터 작성기준··········································································88
    • 5.2.4 구조 BIM 데이터 작성기준··········································································89
    • 5.2.5 건축 BIM 데이터 작성기준··········································································90
    • 5.2.6 기계 및 전기 BIM 데이터 작성기준 ··························································91
    • 5.2.7 토목 및 조경 BIM 데이터 작성기준 ··························································92
  • 5.3 BIM 품질관리기준 ·······························································································94
  • 5.4 BIM 활용기준 ·······································································································96
    • 5.4.1 디자인 검토 ······································································································96
    • 5.4.2 BIM 설계도면 산출························································································97
    • 5.4.3 수량 기초데이터 산출 ····················································································99
    • 5.4.4 환경 시뮬레이션(선택사항) ·········································································101
  • 5.5 BIM 성과품 작성기준·······················································································108
    • 5.5.1 BIM 결과보고서····························································································108
    • 5.5.2 BIM 데이터 파일 작성기준········································································109
    • 5.5.3 BIM 성과품 제출기준··················································································111
  • 5.6 책임과 권리·········································································································113

6. 시공 BIM 적용지침

  • 6.1 개요 ·······················································································································115
  • 6.2 BIM 업무환경 구축 지원 ·················································································118
  • 6.3 BIM 활용기준 ·····································································································119
    • 6.3.1 시공통합모델 제작 및 시공도/제작도면 추출 ········································119
    • 6.3.2 간섭확인/시공성 검토 ··················································································120
    • 6.3.3 대안검토 및 설계변경지원··········································································121
    • 6.3.4 공정시뮬레이션(4D) ····················································································122
    • 6.3.5 수량산출 및 확인··························································································122
    • 6.3.6 As-Built 모델 정보입력 ··············································································123
    • 6.3.7 기타 시각화 자료 제작················································································123
    • 6.3.8 측량 ··················································································································124
    • 6.3.9 안전관리··········································································································124
    • 6.3.10 공사비시뮬레이션(5D) ················································································125
    • 6.3.11 스마트 건설기술 ··························································································126
  • 6.4 BIM 결과보고서·································································································127
  • 6.5 성과품 제출기준 ·································································································127
  • 6.6 책임과 권리·········································································································128

부속서-1 BIM 정보입력기준

  • 1. 일반사항
  • 2. 사업정보의 입력
  • 3. 공간객체의 정보입력
    • 3.1 정보입력
    • 3.2 공간분류코드 목록
  • 4. 부위객체의 정보입력
    • 4.1 부위객체별 라이브러리명
    • 4.2 속성 정보입력
      • 4.3.1 구조 BIM 데이터
      • 4.3.2 건축 BIM 데이터
      • 4.3.3 조달청 표준공사코드 입력의 원칙
  • 5. 범용객체(generic object)의 정보입력
    • 5.1 개요
    • 5.2 건설정보분류체계 부위분류 목록

부속서-2 BIM 정보표현수준

 

부속서-3 BIM 업무수행계획서 표준 템플릿

  • 1. 사업개요
  • 2. BIM 적용기준
    • 2.1 BIM 품질관리기준
    • 2.2 BIM 활용기준
  • 3. BIM 업무수행 환경
    • 3.1 BIM 업무수행 조직
    • 3.2 BIM 관리자 및 기술자 현황
    • 3.3 BIM 업무수행 인력투입 계획
    • 3.4 BIM 업무수행 하드웨어 환경
    • 3.5 BIM 업무수행 소프트웨어 환경
  • 4. BIM 업무수행 일정계획
    • 4.1 BIM 업무수행 일정계획
    • 4.2 중간공정보고 계획
      • 4.2.1 주간공정보고
      • 4.2.2 월간공정보고
  • 5. BIM 데이터 작성 계획
    • 5.1 BIM 적용 대상 및 분야
    • 5.2 BIM 데이터 상세수준
    • 5.3 공간객체 작성 계획
    • 5.4 부위객체 작성 계획
      • 5.4.1 부위 작성대상
      • 5.4.2 부위객체 부재명 및 라이브러리명의 형식
  • 6. BIM 품질관리 계획
    • 6.1 품질관리 대상
    • 6.2 품질관리 수행계획
  • 7. BIM 성과품
    • 7.1 BIM 성과품 목록
    • 7.2 바이러스 체크
  • 8. 책임과 권리
    • 8.1 설계도서와 BIM 데이터의 내용 일치
    • 8.2 설계도서와 BIM 데이터의 책임
    • 8.3 BIM 데이터 품질관리의 책임
    • 8.4 IFC 파일 변환의 책임
    • 8.5 조달청 및 수요기관의 BIM 데이터 사용권리

부속서-4 BIM 결과보고서 표준 템플릿

  • 1. 사업개요
  • 2. BIM 적용기준
    • 2.1 BIM 품질관리기준
    • 2.2 BIM 활용기준
  • 3. BIM 업무수행 결과 분석
    • 3.1 BIM 업무수행 소요시간 분석
    • 3.2 BIM 업무수행 효과 분석
  • 4. BIM 업무수행 환경
    • 4.1 BIM 업무수행 조직
    • 4.2 BIM 관리자 및 기술자 현황
    • 4.3 BIM 업무수행 인력투입 결과
    • 4.4 BIM 업무수행 하드웨어 환경
    • 4.5 BIM 업무수행 소프트웨어 환경
  • 5. BIM 데이터 작성 결과
    • 5.1 BIM 적용 대상 및 분야
    • 5.2 BIM 데이터 상세수준
    • 5.3 공간객체 작성 결과
    • 5.4 부위객체 작성 결과
      • 5.4.1 부위 작성대상
      • 5.4.2 범용객체(generic object) 작성(해당 부위객체 작성 제약 시 처리)
      • 5.4.3 부위객체 부재명 및 라이브러리명의 형식
      • 5.4.4 부위객체별 정보입력 결과
  • 6. BIM 품질관리 결과
    • 6.1 품질관리 대상
    • 6.2 품질관리 수행내용 및 조치결과
    • 6.3 IFC 변환 시 문제발생의 처리
    • 6.4 계획품질 확보
      • 6.4.1 면적조건의 충족
      • 6.4.2 공간배치 요구조건의 충족
      • 6.4.3 장애자 설계조건의 충족
      • 6.4.4 피난 및 방재 설계조건의 충족
    • 6.5 정보품질 확보
    • 6.6 물리품질 확보
      • 6.6.1 공간객체의 중첩방지 검토
      • 6.6.2 부위객체 간의 간섭금지 검토
      • 6.6.3 구조부재 간의 지지 검토
  • 7. BIM 활용 결과
    • 7.1 디자인 검토
      • 7.1.1 투시도 및 조감도 활용
      • 7.1.2 동영상 제작
    • 7.2 BIM 설계도면 산출
      • 7.2.1 BIM 설계도면 작성대상
      • 7.2.2 BIM 설계도면 목록표
    • 7.3 수량 기초데이터 산출
      • 7.3.1 수량 기초데이터 산출대상
      • 7.3.2 수량 기초데이터 산출결과 분석(※ 내역서와 비교)
    • 7.4 환경 시뮬레이션
  • 8. BIM 데이터 활용방안
  • 9. BIM 성과품
    • 9.1 BIM 성과품 목록
    • 9.2 바이러스 체크
  • 10. 책임과 권리
    • 10.1 설계도서와 BIM 데이터의 내용 일치
    • 10.2 설계도서와 BIM 데이터의 책임
    • 10.3 BIM 데이터 품질관리의 책임
    • 10.4 IFC 파일 변환의 책임
    • 10.5 조달청 및 수요기관의 BIM 데이터 사용권리
  • [붙임] BIM 데이터 작성 체크리스트

부속서-5 개산견적을 위한 수량 기초데이터 표준 템플릿

  • 1. 일반사항
  • 2. 수량 집계자료
    • 2.1 수량 집계자료 템플릿 1 (공간객체)
    • 2.2 수량 집계자료 템플릿 2 (부위객체)
  • 3. 수량 근거자료
    • 3.1 수량 근거자료 템플릿 1 (공간객체)
    • 3.2 수량 근거자료 템플릿 2 (부위객체)

부속서-6 BIM 설계대가 사후정산서 표준 템플릿

  • 1. 사업개요
  • 2. BIM 업무수행 환경
    • 2.1 BIM 업무수행 조직
    • 2.2 BIM 관리자 및 기술자 현황
    • 2.3 BIM 업무수행 인력투입 결과
    • 2.4 설계 단계 및 기간별 투입 인원
  • 3. BIM 설계대가 산정 및 사후정산
    • 3.1 BIM 설계 직접인건비 산정
    • 3.2 BIM 설계대가 산정

부속서-7 관급자재 BIM 라이브러리 제작기준

  • 1. 일반사항
  • 2. BIM 라이브러리의 형상 제작
  • 3. BIM 라이브러리의 정보입력
  • 4. BIM 라이브러리의 정보입력(예시)
  • 5. BIM 라이브러리의 파일 제작
    • 5.1 파일 포맷
    • 5.2 파일 명칭
  • 6. BIM 라이브러리의 보급 및 유통

부속서-8 BIM 적용지침서 사용자 가이드

  • Ⅰ. 시설사업 BIM적용지침서 v2.1 해설
    • 1. 지침의 개요 ·······································································································1
    • 2. 조달청 BIM 관리 지침 ················································································3
    • 3. 계획-중간-실시설계 BIM 적용지침 ··························································6
    • 4. 시공단계 BIM 적용지침 ··············································································12
    • 5. FAQ ···················································································································15
  • Ⅱ. BIM 소프트웨어 사용방법 예시
    • 1. Revit 사용자 (Revit 2017 한글판 기준) ·············································17
    • 2. ArchiCAD 사용자 (ARCHICAD22 한글판 기준) ······························92

 


디이씨(D.E.C)